首页> 外文期刊>Power and Energy Systems, CSEE Journal of >Foreword for the special section on AC and DC ultra high voltage technologies
【24h】

Foreword for the special section on AC and DC ultra high voltage technologies

机译:交流和直流超高压技术特别部分的前言

获取原文
获取原文并翻译 | 示例
       

摘要

A LONG with the rapid development of its economy, China is facing serious challenges in energy resources. Coal, hydro, inland wind and solar power are mainly distributed in the West and North of China. However, power demand centers locate in Eastern and Central China. Distance between energy bases and load centers ranges from 800 km to 3000 km. China needs to develop remote and bulk power transmission to optimize power allocation.
机译:随着经济的快速发展,中国在能源资源方面面临着严峻的挑战。煤炭,水电,内陆风能和太阳能主要分布在中国的西部和北部。但是,电力需求中心位于中国东部和中部。能源基地和负载中心之间的距离范围为800 km至3000 km。中国需要发展远程和散装电力传输,以优化电力分配。

著录项

  • 来源
  • 作者

    Weijiang Chen; Xiang Cui;

  • 作者单位

    State Grid Corporation of China (SGCC), Beijing, China;

    North China Electric Power University, Beijing, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:59:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号