首页> 外文期刊>IEEE Transactions on Power Delivery >Separable insulated connector loadbreak testing. II. Providing reliability assurances
【24h】

Separable insulated connector loadbreak testing. II. Providing reliability assurances

机译:可分离的绝缘连接器负载破坏测试。二。提供可靠性保证

获取原文
获取原文并翻译 | 示例
           

摘要

For pt.I see ibid., vol.7, no.2, p.554-9 (1992). A statistical analysis of the ANSI/IEEE loadbreak switching test shows that it cannot offer utilities reliability assurances. An alternative approach to loadbreak testing is presented. It utilizes the concepts of a generic switching reliability characteristic, composite system switching reliability (CSSR), and lower confidence limits to relate laboratory test performance to utility reliability needs.
机译:关于第一部分,见同上,第7卷,第2期,第554-9页(1992年)。对ANSI / IEEE负载中断交换测试的统计分析表明,它不能提供实用程序的可靠性保证。提出了另一种负载破坏测试方法。它利用通用开关可靠性特性,复合系统开关可靠性(CSSR)和较低置信度限制的概念,将实验室测试性能与公用事业可靠性需求联系起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号