Taking environmental constraints into account in the planning of the extra high voltage transmission network; EDF's approach

机译:在规划特高压输电网络时要考虑环境因素;法国电力公司的做法

获取原文
获取原文并翻译 | 示例
       

摘要

As EDF is experiencing increasing difficulties in developing its transmission network, the time may have come to reconsider the projects selection method. In this paper, the authors point out that the currently used method essentially relies on a classical discounted balance criterion. They then present a new method which takes into account the impact of a project on the environment, by considering an environmental risk which may jeopardize the project's success. This method helps to evaluate the probability that each possible route of each project will be carried through. A simple probability computation then allows the derivation of a global comparison of the eligible projects on the basis of an expected discounted balance criterion. Experiments now in progress will help to decide upon this method's efficiency in the context of its operational use.
机译:随着EDF在开发其传输网络方面遇到越来越多的困难,可能已经到了重新考虑项目选择方法的时候了。在本文中,作者指出,当前使用的方法本质上依赖于经典折现余额准则。然后,他们提出了一种新方法,通过考虑可能危害项目成功的环境风险来考虑项目对环境的影响。这种方法有助于评估每个项目的每条可能路线的实现可能性。然后,简单的概率计算就可以根据预期的折现余额标准来推导合格项目的全局比较。目前正在进行的实验将有助于确定该方法在实际使用中的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号