Multicriteria maintenance planning for disconnectors in extra high voltage transmission systems

机译:特高压输电系统中隔离开关的多标准维护计划

获取原文
获取原文并翻译 | 示例

摘要

Maintenance of equipment in the extra high voltage level in Germany is not condition-based but it is performed at fixed time intervals and with the same quality. The ever increasing utilization of the transmission network by means of decentralized supply of renewable energy is changing the demands of the system. Simultaneously, the transmission system operators (TSO) are forced to be more cost effective to keep operating expenses constant. Therefore, the budget needs to be limited so that a maximum profit for the conservation of the reliability of high voltage network is achieved. One possibility for the efficient planning of maintenance is the introduction of additional criteria. In this paper, criteria are presented that can assist in the operational maintenance of center break disconnectors. On the basis of reliability calculations the influence that these additional factors or their combination can achieve is shown by use of a grid system.
机译:在德国,设备的超高压维护不是基于条件的,而是以固定的时间间隔和相同的质量进行的。通过分散地供应可再生能源,传输网络的利用率不断提高,正在改变系统的需求。同时,传输系统运营商(TSO)被迫提高成本效益,以保持运营费用不变。因此,需要限制预算,以便获得最大的利润来保存高压网络的可靠性。有效维护计划的一种可能性是引入附加标准。在本文中,提出了一些标准,可以帮助中心中断隔离开关​​进行操作维护。在可靠性计算的基础上,通过使用网格系统显示了这些附加因素或其组合可以实现的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号