...
首页> 外文期刊>Port Engineering Management >Successful naming and launch ceremony for Chang Jiang Kou 01
【24h】

Successful naming and launch ceremony for Chang Jiang Kou 01

机译:长江口01成功命名及启动仪式

获取原文
获取原文并翻译 | 示例

摘要

The naming and launch ceremony for the 12,000 m~3 trailing suction hopper dredger, Chang Jiang Kou 01, took place on 10 September 2011 at Holland's IHC Merwede shipyard in Kinderdijk. IHC Merwede is building the vessel for Yangtze Estuary Waterway Administration Bureau MOT, People's Republic of China.The contract for the design, construction and delivery of two 12,000 m~3 trailing suction hopper dredgers was signed between Yangtze Estuary Waterway Administration Bureau MOT and IHC Dredgers in July 2008. The keel for the first dredger, Chang Jiang Kou 01, was laid on 21 December 2010 and the vessel will be delivered in the second quarter of 2012.
机译:2011年9月10日,位于荷兰的IHC Merwede船厂在Kinderdijk举行了12,000 m〜3拖曳式吸斗式挖泥船Chang Jiang Kou 01的命名和下水仪式。 IHC Merwede正在为中华人民共和国长江口航道管理局交通运输部建造该船,由长江口航道管理局交通运输部与IHC挖泥船签订了两台12,000 m〜3拖尾式挖泥船的设计,建造和交付合同。 2008年7月,第一艘挖泥船的长江龙骨01号龙骨于2010年12月21日安放,该船将于2012年第二季度交付。

著录项

  • 来源
    《Port Engineering Management》 |2011年第5期|p.20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号