首页> 外文期刊>Port Engineering Management >New parallel runway for Brisbane Airport
【24h】

New parallel runway for Brisbane Airport

机译:布里斯班机场的新平行跑道

获取原文
获取原文并翻译 | 示例
           

摘要

During October 2013 the Brisbane Airport Corporation announced the construction of the 300 ha platform for their new parallel runway. The global Expressions of Interest and subsequent Tender process started in December 2010 with the contract being awarded to the Australian subsidiary of Jan De Nul Group on 3 October 2013. The official announcement ceremony, attended by the Acting Australian Prime Minister, the Honourable Warren Truss and the Brisbane Lord Mayor Graham Quirk took place, appropriately, on the centreline of the future runway. The scope entails the dredging of up to 13m m~3 of sand at 1.5 hrs sailing distance from the airport of Brisbane. For this job, Jan De Nul Group will mobilise its ultramodern trailing suction hopper dredger Charles Darwin, which was built in 2010.
机译:2013年10月,布里斯班机场公司宣布为其新的平行跑道建造300公顷的平台。全球意向书及随后的招标程序于2010年12月开始,合同于2013年10月3日授予Jan De Nul集团澳大利亚分公司。澳大利亚代理总理沃伦·特鲁斯和布里斯班市长格雷厄姆·奎尔克(Graham Quirk)恰好在未来跑道的中心线上举行。该范围需要在距布里斯班机场1.5小时航行距离处疏13高达1300万立方米的沙子。为完成这项工作,Jan De Nul集团将动员于2010年建造的超现代牵引式吸斗式挖泥船Charles Darwin。

著录项

  • 来源
    《Port Engineering Management》 |2013年第6期|19-20|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号