首页> 外文期刊>Port Engineering Management >Lifting specialists improve safety and efficiency on wind turbine assembly site
【24h】

Lifting specialists improve safety and efficiency on wind turbine assembly site

机译:吊装专家提高了风力涡轮机组装现场的安全性和效率

获取原文
获取原文并翻译 | 示例
           

摘要

Towne Lifting & Testing has expanded the scope of its contract with Siemens Gamesa after improving safety and efficiency at its wind turbine pre-assembly site. The specialist company was brought in to ensure all equipment met stringent safety standards and was suitable for lifting operations at the Alexandra Dock facility in Hull. Experts conducted a thorough assessment and introduced new processes and checks to ensure all lifting equipment was correctly used and complied with statutory LOLER and HSE requirements.
机译:Towne Lifting&Testing在提高其风力涡轮机预组装站点的安全性和效率之后,扩大了与Siemens Gamesa的合同范围。该专业公司的加入是为了确保所有设备均达到严格的安全标准,并且适合在赫尔的Alexandra Dock工厂进行起重作业。专家进行了彻底的评估,并介绍了新的流程和检查,以确保正确使用所有起重设备并遵守法定的LOLER和HSE要求。

著录项

  • 来源
    《Port Engineering Management》 |2018年第5期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号