【24h】

PRO PROJECTS!

机译:专业项目!

获取原文
获取原文并翻译 | 示例
           

摘要

Just as a company's fiscal year can run on whatever arbitrary 12 month cycle they deem appropriate to their line ot business, many hot rod shops also do not Follow the traditional Gregorian calendar as the rest of us. Instead, they tend to run their high-level projects on then own time line thai com ludes somewhere around the SEMA Show. Sometimes the night before. That means they'll typically turn theil attention to the next big project right after they touch clown back at the shop Unit's why as soon as the dust settled after SEMA, we immediately started touching base with major shops all around the country to find out what they had brewing for their top projects in 2013.
机译:正如公司的会计年度可以按照他们认为适合其业务的任意12个月的周期运行一样,许多热轧棒车间也不会像我们其他人那样遵循传统的格里高利历法。取而代之的是,他们倾向于在自己的时间表上运行自己的高级项目,而这些时间表包括在SEMA Show周围的某个地方。有时是前一天晚上。这意味着他们通常会在小丑回到商店后立即将注意力转移到下一个大项目上。这就是为什么在SEMA之后尘埃落定之后,我们立即开始与全国各地的主要商店接触,以找出问题所在。他们在2013年为顶级项目酝酿了啤酒。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号