首页> 外文期刊>Platts Megawatt Daily >SoCal Ed secures energy storage for Aliso
【24h】

SoCal Ed secures energy storage for Aliso

机译:SoCal Ed确保Aliso的储能

获取原文
获取原文并翻译 | 示例
       

摘要

Southern California Edison has completed its two solicitations forrnpower storage resources that were launched to ensure electricrnreliability despite the moratorium on injections into the Aliso Canyonrnnatural gas storage facility near Los Angeles.rnThe company on Wednesday said that the two solicitations have led tornthe signing of four contracts for 47 MW of energy storage capacity that isrnexpected to be installed and become operational before the end of this year.rnSoCal Ed has agreed to buy from Tesla a 20-MW lithium ion batteryrnsystem that will be installed at the power company’s Mira Lomarnsubstation in Ontario, California.
机译:南加州爱迪生公司已经完成了两次招标电力存储资源,尽管在洛杉矶附近的Aliso Canyonrn天然气存储设施被暂停注入,但为确保电力可靠性而启动了该公司。周三,该公司表示,两次招标导致四项合同的签订被撕毁。 SoCal Ed同意从特斯拉购买一个20兆瓦的锂离子电池系统,该系统将安装在电力公司位于加利福尼亚州安大略省的Mira Lomarn变电站中,预计将在今年年底之前安装并运行47兆瓦的储能能力。 。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0929期|7-8|共2页
  • 作者

    Jeffrey Ryser;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号