首页> 外文期刊>Platts Megawatt Daily >Texas PUC OKs ERCOT grid link with SERC
【24h】

Texas PUC OKs ERCOT grid link with SERC

机译:德州PUC同意与SERC建立ERCOT网格链接

获取原文
获取原文并翻译 | 示例
       

摘要

The Public Utility Commission of Texas has approved the constructionrnof a 38-mile transmission line that will connect the Electric ReliabilityrnCouncil of Texas to a DC tie in Louisiana.rnIn a draft order filed Thursday, the PUCT approved the City of Garland’srnapplication for a certificate of convenience and necessity (CCN) to build arn38-mile, 345-kV line in Rusk and Panola counties that would connectrnERCOT with the SERC Reliability Corporation “using a high-voltage, directrncurrent tie owned by Southern Cross Transmission LLC.”
机译:得克萨斯州公共事业委员会批准了一条38英里长的输电线路,该线路将把得克萨斯州电力可靠性委员会与路易斯安那州的直流电连接起来。在周四提交的命令草案中,PUCT批准了加兰市的证书申请便利和必要性(CCN)在Rusk和Panola县中建立arn38英里,345 kV线路,该线路将erCOT与SERC可靠性公司“使用Southern Cross Transmission LLC拥有的高压直流电连接”。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0829期|4-4|共1页
  • 作者

    Jeffrey Ryser;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号