首页> 外文期刊>Platts Electric Utility Week >texas senate panel oKs PuC assessments of grid reliability during extreme weather
【24h】

texas senate panel oKs PuC assessments of grid reliability during extreme weather

机译:德州参议院小组在极端天气下对电网可靠性进行PuC评估

获取原文
获取原文并翻译 | 示例
       

摘要

The Public Utility Commission of Texas could be required to nconduct an extensive assessment of how the electric grid might nhandle future extreme weather events, such as the early February nwinter storm that knocked out almost one-third of generators in nthe Electric Reliability Council of Texas’ footprint, according to a nbill unanimously passed by the Texas Senate last week.
机译:可能需要德克萨斯州公用事业委员会对电网如何处理未来的极端天气事件进行广泛评估,例如2月初的冬季暴风雨将德克萨斯州电力可靠性委员会的几乎三分之一的发电机击倒。据德克萨斯州参议院上周一致通过的一份比尔称。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号