首页> 外文期刊>Platts Megawatt Daily >Rules may deter Mexican market participation
【24h】

Rules may deter Mexican market participation

机译:规则可能阻止墨西哥市场的参与

获取原文
获取原文并翻译 | 示例
       

摘要

Mexico's next long-term power auction process is to start April 29, arngrid operator spokeswoman said Wednesday, but market rules and arnlack of clarity around them may be discouraging participation by GulfrnCoast-area companies, a mini-poll conducted Wednesday shows.rnMexico's National Energy Control Center (CENACE), the newrnindependent system operator, completed its first round of long-termrnauctions at the end of March, after having to re-evaluate preliminaryrnresults, ultimately procuring integrated MWh/clean-energy certificatesrnat an average price of $41.80/MWh, assuming an exchange rate of 17.33rnpesos to the dollar.
机译:阿格里德运营商女发言人周三表示,墨西哥的下一个长期电力拍卖程序将于4月29日开始,但周三进行的一次小型民意测验显示,市场规则和缺乏明确的态度可能会阻碍湾岸公司的参与。新独立的系统运营商控制中心(CENACE)在必须重新评估初步结果之后,于3月底完成了第一轮长期航行,最终以平均价格41.80美元/ MWh的价格购买了MWh /清洁能源证书,假设美元对美元的汇率为17.33rnpesos。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0415期|6-6|共1页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号