首页> 外文期刊>Platts Megawatt Daily >MISO unveils first batch of possible projects in regional grid planning process
【24h】

MISO unveils first batch of possible projects in regional grid planning process

机译:Miso推出了第一批可能的项目在区域网格计划过程中

获取原文
获取原文并翻译 | 示例
       

摘要

Midcontinent Independent System Operator has identified a handful of projects that could form the core of its long-range transmission portfolio, pointing to a wide range of benefits that could come from pursuing regional grid projects. Stakeholders are divided on the benefits of regional grid projects, with some arguing MISO should look at a broader range of benefits from transmission, and others arguing MISO is ignoring some key costs. MISO has run into controversy at several points in its long-range transmission planning process. MISO president Clair Moeller recently defended the grid operator’s approach to cost allocation and argued that the grid operator would continue to move ahead with a batch of large grid projects needed to integrate renewables and meet state and utility climate goals.
机译:中等内部的独立系统运营商已确定可能构成其远程传输组合的核心的少数项目,指向可能来自追求区域网格项目的广泛效益。 利益攸关方分为区域网格项目的好处,一些争论味噌应该看看传播的更广泛的福利,其他人争论味噌正在忽略一些主要成本。 Miso在远程传输计划过程中的几个点遇到了争议。 MISO总统Clair Moeller最近捍卫了网格运营商的成本分配方法,并认为网格运营商将继续前进,批量批准融合可再生能源和符合国家和公用事业气候目标所需的大型网格项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号