...
首页> 外文期刊>Platts Megawatt Daily >PJM stakeholders struggle to find ideal capacity-market fix
【24h】

PJM stakeholders struggle to find ideal capacity-market fix

机译:PJM利益相关者努力寻找理想的能力市场修复

获取原文
获取原文并翻译 | 示例
           

摘要

As PJM Interconnection grapples with resource adequacy questions while making changes to its capacity market, a diverse group of stakeholders said a durable carbon pricing mechanism could help and that capacity auctions should restart while additional market improvements are considered. "The pace of change in our industry is accelerating with changes in technology, distributed generation, batteries, offshore wind, electric vehicles, significantly improved consumer control and flexibility of their load and smart grid technologies, just to name a few," PJM president and CEO Manus Asthana, said during the grid operator's Sept. 9 General Session that focused on resource adequacy. Some PJM states are taking "aggressive steps" to decarbonize their power generation sources, Asthana said. And the change is happening now, he said, with about 107 GW of generation in the interconnection queue, of which roughly 86% is either solar, wind, or battery.
机译:由于PJM互连具有资源充足问题的努力,同时对其容量市场进行了变化,因此多样化的利益相关者表示,持久的碳定价机制可以有所帮助,并且该容量拍卖应该重启,同时考虑额外的市场改善。 “我们行业的变化步伐正在加速技术,分布式发电,电池,海上风,电动汽车的变化,显着提高了负载和智能电网技术的消费者控制和灵活性,只是为了命名几个”PJM总统和CEO Manus Asthana,在网格运营商的9月9日普通会议上专注于资源充足性。 Asthana表示,一些PJM国家正在采取“积极的步骤”来脱碳,以脱碳。他说,这一变化正在发生,在互连队列中大约107 GW发电,其中大约86%是太阳能,风或电池。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号