首页> 外文期刊>Platts Megawatt Daily >ISO-NE fuel security program will take effect due to lack of FERC quorum
【24h】

ISO-NE fuel security program will take effect due to lack of FERC quorum

机译:由于缺乏FERC法定人数,ISO-NE燃油安全计划将生效

获取原文
获取原文并翻译 | 示例
           

摘要

An ISO New England program to pay resources that keep fuel oranother form of potential energy on hand during the winter will go intoeffect by operation of law because the Federal Energy RegulatoryCommission lacked a quorum to act on the grid operator's proposal.The unusual development was announced by the federal powerregulator in a notice (ER19-1428) on Tuesday. FERC requires at leastthree voting members for a quorum, which suggests that at least twoof the body's four sitting members recused themselves from acting onthe proposal.A FERC spokesman declined to provide additional details aboutwhy the commission lacked a quorum
机译:新的ISO新英格兰计划将支付在冬季保留手头燃料或其他形式的势能的资源,这将通过法律的实施而生效,因为联邦能源管理委员会缺乏法定人数来采取行动 r n联邦电力监管机构在周二的公告(ER19-1428)中宣布了不寻常的发展。 FERC至少需要 r n三名投票成员才能达到法定人数,这表明该机构的四名常任理事国中至少有两名 r n拒绝按照提案采取行动。 r nFERC发言人拒绝提供额外的建议。 r n为什么委员会没有达到法定人数的详细信息

著录项

  • 来源
    《Platts Megawatt Daily》 |2019年第8期|6-7|共2页
  • 作者

    Zack Hale;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号