首页> 外文期刊>Inside NRC >EDF delays fuel loading at Flamanville-3 to end of 2022
【24h】

EDF delays fuel loading at Flamanville-3 to end of 2022

机译:EDF将Flamanville-3的燃料装载推迟到2022年底

获取原文
获取原文并翻译 | 示例
           

摘要

EDF will delay fuel loading at its new Flamanville-3 EPR in northern France until the end of 2022 to make repairs on welds in the unit's main secondary coolant system, delaying operation until early 2023, Xavier Ursat, the executive director in charge of nuclear engineering and new build at EDF, said October 9 during a conference call for reporters. EDF will use robots to make the repairs, which are in a hard-to-access section of the piping, Ursat said. The delay combined with the additional work, which will require EDF to repeat many hot functional tests, will increase project costs by Eur1.5bn ($1.65 billion), Ursat said.
机译:EDF将把法国北部新的Flamanville-3 EPR的燃料装载推迟到2022年底,以便对该单元的主要二次冷却剂系统的焊缝进行维修,并将运行推迟到2023年初,核工程负责人Xavier Ursat 10月9日,在对记者举行的电话会议上,法国电力公司的新机和新机的消息传出。乌萨特说,法国电力公司将使用机器人进行维修,该维修位于管道难以进入的区域。乌尔萨特说,这一延误加上额外的工作,这将要求法国电力公司重复进行许多热门的功能测试,这将使项目成本增加15亿欧元(合16.5亿美元)。

著录项

  • 来源
    《Inside NRC》 |2019年第21期|5-6|共2页
  • 作者

    Joel Spaes;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号