...
首页> 外文期刊>Platts Inside Energy >40 square miles of savannah River site cleaned up early with stimulus funds
【24h】

40 square miles of savannah River site cleaned up early with stimulus funds

机译:刺激资金尽早清理了40平方英里的萨凡纳河遗址

获取原文
获取原文并翻译 | 示例
           

摘要

The Energy Department announced last week that the so-ncalled “M Area” at the Savannah River Site in South Carolina nhas been cleaned up nearly two years ahead of schedule.nDOE said the project was accelerated thanks to a $1.6-billion ninfusion from last year’s economic-stimulus law. n“M Area cleanup marks a significant step toward meeting nour environmental commitments at SRS, and toward reducing nthe operating footprint associated with the site’s past mission,” nsaid Ines Triay, DOE’s assistant secretary for environmental nmanagement. “At the same time, we were able to create or nretain more than 3,600 jobs at SRS and train those workers, nwhich are exactly the type of return we anticipated from our ninvestment in the Recovery Act program.”
机译:能源部上周宣布,南卡罗来纳州萨凡纳河工地的所谓“ M区”已提前两年清理完毕。美国能源部表示,由于去年的注资16亿美元,该项目得以加速。经济刺激法。美国能源部环境管理助理部长伊内斯·特里(Ines Triay)说:“清理M区域标志着朝着在SRS上履行对环境的承诺,并减少与该站点过去的任务相关的运营足迹迈出了重要的一步。” “与此同时,我们能够在SRS上创造或保留3,600多个工作岗位,并对这些工人进行培训,这正是我们对《复苏法案》计划进行n项投资所期望的回报类型。”

著录项

  • 来源
    《Platts Inside Energy》 |2010年第1025期|p.15-16|共2页
  • 作者

    Herman Wang;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号