...
首页> 外文期刊>Platts Energy Trader >FERC grants temporary certificate to Spire gas pipe, enabling winter operations
【24h】

FERC grants temporary certificate to Spire gas pipe, enabling winter operations

机译:FERC授予临时证书以旋转气体管道,实现冬季运营

获取原文
获取原文并翻译 | 示例
           

摘要

The US Federal Energy Regulatory Commission Dec. 3 granted an additional temporary certificate to Spire STL Pipeline, ending questions about whether the 65-mile, 400,000 Dt/d gas pipeline would be able to continue operating through the winter 2021-22 heating season. After the US Court of Appeals for the District of Columbia Circuit in June vacated Spire's certificate authorization, FERC in September granted a 90-day certificate that was set to expire Dec. 13. FERC's new certificate will stay in effect until FERC acts in the case on remand in relation to Spire's long-term authorization.
机译:美国联邦能源监管委员会12月3日授予销售STL管道的额外临时证书,结束了关于65英里,400,000名DT / D天然气管道是否能够继续经营2021-22加热季节的问题。 在美国哥伦比亚赛赛区院审法院返回尖顶的证书授权之后,FERC于9月份授予120天的证书,该证明将于12月13日到期.13. FERC的新证书将在案件中持续留下; 据说与尖顶的长期授权有关。

著录项

  • 来源
    《Platts Energy Trader》 |2021年第7期|18-19|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号