...
首页> 外文期刊>Platts Energy Trader >Real-time co-optimization to require offer cap adjustments in ERCOT : memo
【24h】

Real-time co-optimization to require offer cap adjustments in ERCOT : memo

机译:实时共同优化要求在ERCOT中提供CAP调整:备忘录

获取原文
获取原文并翻译 | 示例
           

摘要

Implementing real-time co-optimization of energy and ancillary services in the Electric Reliability Council of Texas may require some adjustments to ERCOT’s systemwide offer cap, normally $9,000/MWh, states a Public Utility Commission of Texas filing slated for discussion June 27. Thursday’s memo by Mark Bryant, senior economist at the Public Utility Commission of Texas’s Competitive Markets Division, suggests cutting the systemwide offer cap from $9,000/MWh to $2,000/MWh, which would imply that the Ancillary Services Demand Curve maximum could only reach $7,000/MWh, a Texas regulatory filing states (Project No. 48540).
机译:在德克萨斯州电力可靠性委员会中实施能源和辅助服务的实时共同优化可能需要对埃尔科的系统展示,通常为9,000美元/兆瓦的议员的德克萨斯·申请人讨论举行的公用事业委员会,以便进行一些调整。周四的备忘录德克萨斯州竞争市场公用事业委员会部门的高级经济学家Mark Bryant建议将Systemwide提供帽从9,000美元/兆瓦机削减到2,000美元/兆瓦,这意味着辅助服务需求曲线最大值只能达到7,000美元/兆瓦德克萨斯州监管申请国(项目号48540)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号