...
首页> 外文期刊>Platts Energy Trader >ISO-NE expects sufficient power supplies during first winter without Pilgrim nuclear plant
【24h】

ISO-NE expects sufficient power supplies during first winter without Pilgrim nuclear plant

机译:ISO-NE预计在没有朝圣者核电站的情况下,第一个冬季将有足够的电力供应

获取原文
获取原文并翻译 | 示例

摘要

ISO New England expects to have an ample supply of power this winterto meet demand which it estimates will peak at 20,476 MW undernormal weather conditions or 21,173 MW at extremely coldtemperatures. Higher winter natural gas prices could also push upregional power prices, an analyst said Thursday.“The power plants and demand-side resources with obligations tobe available are sufficient to meet the forecasted peak demand underboth normal and extreme weather conditions,” the grid operator said ina statement Wednesday.
机译:ISO新英格兰预计今年冬季将有充足的电力供应,以满足需求,据估计,在正常天气条件下峰值将达到20476兆瓦,在极端寒冷温度下将达到21173兆瓦。分析师周四表示,冬季天然气价格上涨也可能推高地区电力价格。“电网和有需求的可用资源足以满足正常和极端天气条件下的预测高峰需求。”星期三的ina声明。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号