...
首页> 外文期刊>Platts Energy Trader >Controversial ruling moves New England downstream pipe closer to service
【24h】

Controversial ruling moves New England downstream pipe closer to service

机译:有争议的裁决使新英格兰下游管道更接近服务

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

New England consumers are one step closer to seeing lower gas prices by next winter, thanks to a recent environmental approval that moves a proposed downstream pipeline closer to startup. On Friday, the Massachusetts Department of Environmental Protection issued a long-awaited air quality permit for Spectra Energy’s 7,700 horsepower compressor station to be constructed in Weymouth, Massachusetts – a key component of the company’s Atlantic Bridge pipeline project. Despite strong opposition from local citizens, politicians and the mayor of Weymouth, the state agency found that the compressor station would not pose any significant health risk to residents, moving the project forward. The town’s opposition, including protesters, has expressed the intent to appeal the state’s ruling in the months ahead. Still, the permit marks a major step forward for downstream gas markets in New England, which have long faced severe price spikes, The law, Dumoulin-Smith said, is “inconclusive” and has no precedent in the US Court of Appeals for the 9th Circuit, which covers California. “There is a long list of unsecured creditors that are exposed to cash-flow interruptions including above-market renewable suppliers, natural gas suppliers, storage project developers, [Community Choice Aggregators], all of which receive 100% of their revenue through the [investor-owned utilities], and [California ISO] market participants,” said Gary Ackerman, the former executive director of the Western Power Trading Forum.
机译:由于最近的环保批准使拟议中的下游管道更接近启动,因此新英格兰的消费者到明年冬天看到天然气价格将走近一步。周五,马萨诸塞州环境保护部为Spectra Energy即将在马萨诸塞州韦茅斯建造的7700马力压缩机站颁发了期待已久的空气质量许可证,这是该公司大西洋大桥管道项目的重要组成部分。尽管当地公民,政界人士和韦茅斯市长强烈反对,但国家机构发现压缩站不会对居民构成任何重大健康风险,从而推动了该项目的发展。该镇的抗议者,包括抗议者,已表示有意在未来几个月内对该州的裁决提出上诉。 Dumoulin-Smith说,该许可证仍然是新英格兰下游天然气市场向前迈出的一大步,新英格兰下游天然气市场长期以来一直面临着严重的价格飙升,该法律“尚无定论”,并且在美国上诉法院第九届会议上没有先例。覆盖加利福尼亚州的赛道。 “有很多无担保债权人面临现金流中断的风险,包括市场上可再生能源供应商,天然气供应商,存储项目开发商,[社区选择综合商],所有这些人都通过[西部电力交易论坛前执行董事加里·阿克曼(Gary Ackerman)说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号