...
首页> 外文期刊>Energy economist >Beach adds second shale well
【24h】

Beach adds second shale well

机译:海滩增加了第二个页岩井

获取原文
获取原文并翻译 | 示例
           

摘要

Australia's Beach Energy has announced plans to accelerate its shale gas exploration drilling program in the Cooper Basin in South Australia by adding a second well. The Holdfast-1 well, which is expected to spud in July in the PEL 218 tenement, will now be immediately followed by a second well about 20 kilometers to the southeast, the company said. The wells will be the first to be drilled in eastern Australia for shale gas.rn"We are moving forward rapidly to develop a shale gas project in the Cooper Basin," CEO Hector Gordon said. "The addition of a second well to our first drilling program is designed to accelerate the timetable for booking our first shale gas resources and first gas production. "Subject to the results of the first two Holdfast wells, we aim to be producing gas from our first pilot project in 2011."
机译:澳大利亚的海滩能源公司已宣布计划增加第二口井,以加快其在南澳大利亚库珀盆地的页岩气勘探钻探计划。该公司称,Holdfast-1井预计将于7月在PEL 218矿权区中开钻,现在将紧随其后的是东南20公里处的第二口井。这些油井将是澳大利亚东部第一个钻探页岩气的井。rn“我们正在迅速推进以在库珀盆地开发页岩气项目,”首席执行官赫克托·戈登说。 “在我们的第一个钻探计划中增加第二口井的目的是加快预定第一批页岩气资源和第一批天然气生产的时间表。”根据前两批Holdfast井的结果,我们的目标是从我们的第一口井中生产天然气。 2011年的第一个试点项目。”

著录项

  • 来源
    《Energy economist》 |2010年第343期|p.38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号