首页> 外文期刊>Energy economist >LETTER FROM WASHINGTON
【24h】

LETTER FROM WASHINGTON

机译:华盛顿的信

获取原文
获取原文并翻译 | 示例
       

摘要

American Electric Power, the nation's largest coal-burning utility, says it will have to invest $6-8 billion, retire a quarter of its coal-fired plants in three years and retrofit and refuel more than 11 GW to comply with a suite of pending rules from the Environmental Protection Agency. AEP CEO Michael Morris said the retirements and idling for retrofits would "abruptly cut generation capacity in the Midwest by more than 5,400 MW," while compliance costs would push electricity rates up by 10% to more than 35%. About 600 jobs would be lost, he said.
机译:美国最大的燃煤公用事业公司美国电力公司(American Electric Power)表示,将必须投资6至80亿美元,在三年内淘汰其四分之一的燃煤电厂,并对超过11吉瓦的燃煤电厂进行改造和加油,以符合一系列未决的申请。环境保护局的规定。 AEP首席执行官迈克尔·莫里斯(Michael Morris)表示,退休和进行空转将“中西部地区的发电量突然减少5400兆瓦以上”,而合规成本将使电费上涨10%至35%以上。他说,将失去约600个工作岗位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号