...
首页> 外文期刊>Power in Europe >Alstom Wins Turkish Hydro Contract
【24h】

Alstom Wins Turkish Hydro Contract

机译:阿尔斯通赢得土耳其水电合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Alstom Hydro has signed a €70 million contract with Turkish generator Enerjisa Enerji Uretim to supply equipment to three new hydropower plants being built on the Seyhan and Goksu rivers in Adana province, southern Turkey, Alstom said December 22.rnEnerjisa Enerji Uretim is owned by Verbund of Austria and Sabanci Group of Turkey. Once completed, the hydro plants Kavsakbendi, Kopru and Menge will have a total power output of 417 MW, capable of producing 1,200 GWh/yr. Kavsakbendi will comprise 3 × 61-MW turbine generator units rated 66 MVA. Kopru will comprise 2 × 74-MW turbine generator units rated 80 MVA. Menge will comprise 2 × 43 MW turbine generator units rated 50 MVA. The three plants are due to begin commercial operation between 2010 and 2011.rnEnerjisa Enerji Uretim aims to reach installed capacity of 5,000 MW and control 10% of the Turkish power market by 2015.
机译:阿尔斯通12月22日表示,阿尔斯通水电已与土耳其发电机Enerjisa Enerji Uretim签署了一项7000万欧元的合同,向位于土耳其南部阿达纳省的Seyhan和Goksu河上的三座新水电厂提供设备。和土耳其的萨班哲集团。一旦完成,Kavsakbendi,Kopru和Menge水电站的总发电量将为417 MW,每年可产生1,200 GWh。 Kavsakbendi将包括3台额定功率为66 MVA的61兆瓦涡轮发电机。 Kopru将包括2台额定功率80 MVA的74兆瓦涡轮发电机。 Menge将包括2台额定功率为50 MVA的43 MW涡轮发电机。这三个电厂将于2010年至2011年之间开始商业运营。rnEnerjisa Enerji Uretim的目标是到2015年达到5,000兆瓦的装机容量,并控制土耳其电力市场的10%。

著录项

  • 来源
    《Power in Europe》 |2009年第542期|58|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号