...
首页> 外文期刊>Power in Europe >OK for Lower Austrian wind
【24h】

OK for Lower Austrian wind

机译:还可以接受下奥地利风

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Four wind parks approved last week by the Lower Austrian government will add 87 MW in Lower Austria, already host to 55% of Austria's 1,011 MW wind capacity. By 2015 Lower Austria expects to have added 170 turbines, doubling total wind output. Nearly 100% of the province's electricity needs should be met in 2015 via renewables, with both major and small hydro continuing to form the steady core of the sourcing. The four wind parks are to be built at Schamdorf (6 turbines), Prellenkirchen (8), Petronell-Carnuntum (7) and Bad-Deutsch-Altenburg (7). Lower Austria currently boasts 353 turbines in 111 parks with a total capacity of 557.3 MW.
机译:下奥地利政府上周批准的四个风电场将在下奥地利州增加87兆瓦的装机容量,已经容纳了奥地利1,011兆瓦风能的55%。到2015年,下奥地利州预计将增加170台涡轮机,使总风能输出增加一倍。 2015年,该省将近100%的电力需求将通过可再生能源来满足,而大型和小型水电将继续构成采购的稳定核心。这四个风电场将在Schamdorf(6个涡轮机),Prellenkirchen(8),Petronell-Carnuntum(7)和Bad-Deutsch-Altenburg(7)建立。下奥地利州目前在111个公园中拥有353台涡轮机,总容量为557.3 MW。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号