首页> 外文期刊>Power in Europe >Swissgrid tests burial option
【24h】

Swissgrid tests burial option

机译:Swissgrid测试埋葬选项

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Swiss transmission grid operator Swissgrid plans to test the feasibility of burying sections for future extensions of the 380 kV grid. The change of heart follows a decision of the Federal Supreme Court concerning the Riniken section. The court noted that underground cable technology now offers better performance as well as greater reliability and cost-effectiveness. Following this decision the Federal Administrative Court in September ruled in favor of the commune of Tuggen and landowners in canton Schwyz and against Axpo and the Swiss Federal Office of Energy (SFOE), calling on Axpo to explore the possibility of burial for the Grynau-Siebnen grid section.
机译:瑞士输电网运营商Swissgrid计划测试为380 kV电网的未来扩展埋设部分的可行性。联邦最高法院关于Riniken案的决定改变了心意。法院指出,地下电缆技术现在可以提供更好的性能以及更高的可靠性和成本效益。根据这一决定,联邦行政法院于9月做出裁决,支持图维兹州的图根公社和地主公社,反对阿克斯波和瑞士联邦能源局(SFOE),呼吁阿克斯波探讨为格赖瑙-西伯嫩埋葬的可能性网格部分。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号