...
首页> 外文期刊>Power in Europe >Gc rules open to comments
【24h】

Gc rules open to comments

机译:Gc规则有待评论

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Under the so-called "hearings" procedure, Norway's petroleum and energy ministry has invited interested parties to comment on the draft regulations it has prepared concerning the planned joint Norwegian-Swedish electricity certificate market (PIE 605/16). Announcing this on September 14, the ministry said the regulations cover approval of production units under the system, measurement and reporting, the certificate register and information to end users. It noted that many of the management tasks involved would be handled by regulator NVE (Norwegian Watercourse and Energy Directorate). Deadline for comments is October 28.
机译:根据所谓的“听证会”程序,挪威石油和能源部已邀请有关方面对其拟定的计划中的挪威-瑞典联合电力证书市场法规草案(PIE 605/16)发表评论。环保部在9月14日宣布这一消息,称法规涵盖了该系统下生产单位的批准,测量和报告,证书登记以及向最终用户提供的信息。它指出,涉及的许多管理任务将由监管机构NVE(挪威水道和能源局)处理。评论截止日期为10月28日。

著录项

  • 来源
    《Power in Europe》 |2011年第609期|p.18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号