...
首页> 外文期刊>Power in Europe >Redispatch rules challenged
【24h】

Redispatch rules challenged

机译:重新分配规则受到挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

German power plant operators may sue against new redispatch rules set out by the federal grid regulator, German energy lobby group BDEW said November 8. "Instead of a fair and adequate compensation for essential grid-stabilizing redispatch measures, thermal power plants are burdened with disproportional high demands," BDEW Managing Director Hildegard Mueller said.Transmission system operators increasingly have to use redispatch measures (calling on thermal plant operators to adjust output at short notice) to ensure grid stability in the face of Germany's booming intermittent renewables sector.
机译:德国能源游说组织BDEW于11月8日表示,德国发电厂运营商可能会起诉联邦电网监管机构制定的新的再分配规则。“与基本的电网稳定再分配措施相比,火力发电厂没有公平合理地补偿,反而负担不成比例。 BDEW董事总经理Hildegard Mueller表示。面对德国蓬勃发展的间歇性可再生能源部门,输电系统运营商越来越需要采用重新分配措施(呼吁热电厂运营商在短时间内调整产量)来确保电网稳定。

著录项

  • 来源
    《Power in Europe》 |2012年第638期|p.15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号