首页> 外文期刊>Energy in East Europe >Draft plan approved for Komarnica
【24h】

Draft plan approved for Komarnica

机译:批准针对Komarnica的计划草案

获取原文
获取原文并翻译 | 示例
           

摘要

Montenegro's government approved April 17 a draft spatial plan for a multi-purpose dam and hydropower plant on the River Komarnica.The plan, which was commissioned by the Ministry of Sustainable Development, and prepared by Slovenia's Geateh and local companies Urbi Montenegro and WINsoft, calculated the cost of the 168-MW Komarnica plant at €183 million, including €94 million for civil works, €57 million for electromechanical equipment, €12 million for hydro-mechanical equipment, €13 million for project design and administration and €7 million for grid connections.
机译:黑山政府于4月17日批准了在科马里尼察河上的多用途水坝和水力发电厂的空间计划草案,该计划是由可持续发展部委托,由斯洛文尼亚的Geateh以及当地公司Urbi Montenegro和WINsoft编制的, 168兆瓦Komarnica电厂的成本为1.83亿欧元,其中包括9400万欧元的土建工程,5700万欧元的机电设备,1200万欧元的水力机械设备,1300万欧元的项目设计和管理以及700万欧元用于电网连接。

著录项

  • 来源
    《Energy in East Europe》 |2012年第239期|p.15-16|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号