首页> 外文期刊>Electric Utility Week >Virginia regulators decide Allegheny Power does not need to absorb fuel, purchased-power costs
【24h】

Virginia regulators decide Allegheny Power does not need to absorb fuel, purchased-power costs

机译:弗吉尼亚州监管机构决定,Allegheny Power不需要吸收燃料和购电成本

获取原文
获取原文并翻译 | 示例

摘要

Allegheny Power won a victory last week when Virginia regulators ruled that the utility's obligations to absorb higher fuel and purchased power costs will end December 31. The Virginia State Corporation Commission disagreed with others, including its own staff, and decided the utility's obligations end when rate caps come off and Virginia utilities no longer have an obligation to service default customers. The decision paves the way for the SCC to decide whether Allegheny should be permitted to recover its fuel and purchased power costs from July 1 through June 30, 2009, said Andy Farmer, a SCC spokesman. Under a memorandum of understanding the utility signed in 2000, Allegheny divested its generating units to its subsidiary Allegheny Energy Supply and agreed to absorb the risk of future fuel price fluctuations. Allegheny now has asked for full purchased power cost recovery of $132.9 million for the year. In last week's order, the SCC gave Allegheny two weeks to file its plan for meeting future load obligations. The plan must include schedules for building new power plants and possibly returning generation now owned by Allegheny Energy Supply to Allegheny's Virginia rate base. The utility also must file all agreements related to the transfer of its generating units to the affiliate and all power purchase agreements between Allegheny Power and its affiliates.
机译:Allegheny Power上周赢得了胜利,当时弗吉尼亚州的监管机构裁定该公用事业承担更高的燃料和购买的电力成本的义务将在12月31日结束。弗吉尼亚州公司委员会与其他人(包括其自己的员工)不同意,并决定该公用事业的义务在费率下降时终止。上限减少了,弗吉尼亚公用事业公司不再有义务为默认客户提供服务。 SCC发言人安迪·法默(Andy Farmer)表示,这一决定为SCC决定是否允许Allegheny从2009年7月1日至6月30日收回其燃料和购买的电力成本铺平了道路。根据该公用事业公司于2000年签署的谅解备忘录,阿勒格尼将其发电机组出售给了其子公司阿勒格尼能源供应公司,并同意承担未来燃料价格波动的风险。阿勒格尼现在要求该年度的全部购买电力成本收回1.329亿美元。在上周的命令中,SCC给了阿勒格尼两周的时间来提交其履行未来负荷义务的计划。该计划必须包括建设新电厂的时间表,并可能将阿勒格尼能源供应公司现在拥​​有的发电返回阿勒格尼的弗吉尼亚费率基准。电力公司还必须提交与将其发电机组转让给关联公司有关的所有协议,以及Allegheny Power及其关联公司之间的所有购电协议。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号