首页> 美国政府科技报告 >Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Allegheny Energy Supply Company, Pleasants Power Station, McElroys Run Dam, Willow Island, West Virginia
【24h】

Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Allegheny Energy Supply Company, Pleasants Power Station, McElroys Run Dam, Willow Island, West Virginia

机译:大坝安全煤燃烧表面蓄水评估(任务3)最终报告,allegheny能源供应公司,pleasants电站,mcElroys Run Dam,Willow Island,西弗吉尼亚州

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Allegheny Energys McElroys Run Dam at the Pleasants Power Station, which is located in Willow Island, West Virginia as shown on Figure 1 Project Location Map. CHA made a site visit on October 13, 2009 to inventory coal combustion surface impoundments at the facility, perform visual observations of the containment dikes, and collect relevant information regarding the site assessment.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号