首页> 外文期刊>Plant & civil engineer >£500,000 Pumped into Clabby Road, Fivemiletown
【24h】

£500,000 Pumped into Clabby Road, Fivemiletown

机译:£500,000注入五英里镇克拉比路

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

NI Water, together with its project team including GRAHAM Construction and AECOM, has commenced work on a new wastewater Pumping station at Clabby Road, Fivemiletown. The project will involve replacing the existing Pumping Station to increase capacity and allow for future development in the area. It is anticipated that work will be completed by Summer 2016. The work will involve the con- struction of a new underground Wastewater Pumping Station on the same site as the existing station, along with the replacement of a small section of sewage pumping main and associated improvements.
机译:NI Water及其项目团队(包括GRAHAM Construction和AECOM)已开始在Fivemiletown的Clabby Road新建污水泵站。该项目将涉及更换现有的泵站,以增加容量并允许该地区的未来发展。预计该工程将于2016年夏季完成。该工程将包括在与现有污水处理厂相同的地点建造一个新的地下污水抽水站,并更换一小部分的污水抽水主管和相关设施。改进。

著录项

  • 来源
    《Plant & civil engineer》 |2016年第maraaapra期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号