首页> 外文期刊>Pipeline & gas journal >HDD Solves Pipeline Installation Dilemma For Pemex
【24h】

HDD Solves Pipeline Installation Dilemma For Pemex

机译:HDD解决了Pemex的管道安装难题

获取原文
获取原文并翻译 | 示例
           

摘要

Mears Group, Inc.'s MearsMex office in San Pedro-Nuevo Leon, Mexico recently com-pleted a horizontal directional drilling project for Pemex that took an already unique trenchless construction technique to new limits. The completed project provided two 8-inch diameter steel pipelines between Pemex's existing Campo III and Campo V storage facilities in the city of Poza Rico in the state of Veracruz. MearsMex manager Tomas Iglesias said the length, location and depth of the trench-less bores on the project made the job especially challenging. He was referring to two directional bores with distances of 2,627 feet and 5,338 feet, respectively. The challenge of the location is because the Campo field's storage facilities are located in the middle of Poza Rico, a town that grew up in, and around, a Pemex oil field.
机译:Mears Group,Inc.在墨西哥圣佩德罗-新莱昂的MearsMex办事处最近完成了Pemex的水平定向钻探项目,该项目将本已独特的非开挖施工技术推向了新的极限。已完成的项目在韦拉克鲁斯州Poza Rico市的Pemex现有的Campo III和Campo V仓储设施之间提供了两条8英寸直径的钢管。 MearsMex经理Tomas Iglesias说,该项目中无沟槽钻孔的长度,位置和深度使这项工作特别具有挑战性。他指的是两个定向孔,分别为2627英尺和5338英尺。该位置面临的挑战是因为Campo油田的存储设施位于Poza Rico的中部,该镇在Pemex油田及其周围长大。

著录项

  • 来源
    《Pipeline & gas journal》 |2006年第1期|p.384042|共3页
  • 作者

    Rita Tubb;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号