【24h】

WORLD NEWS

机译:世界新闻

获取原文
获取原文并翻译 | 示例
       

摘要

Trans Adriatic Pipeline AG awarded Spiecapag, a subsidiary of Entrepose (VINCI Group), the EPC contract for three legs of the onshore Trans-Adriatic Pipeline (TAP) project. One, in Greece between Kipoi and Kavala, is 185 km, while two, between Bilisht and Topoje in Albania, total 215 km. Also, Hill International has received a contract from Technipetrol Hellas S.A., an affiliate of Technip S.A., to provide project management support services in connection with construction of the project. TAP is the European leg of the Southern Gas Corridor, a complex value chain of energy projects that links natural gas supplies from Azerbaijan to Europe. The 870-km pipeline will connect to the Trans Anatolian Pipeline on the Turkish-Greek border, and run through Greece, Albania and the Adriatic Sea before coming ashore in southern Italy. The project is expected to be completed by 2020.
机译:Trans Adriatic Pipeline AG授予Entrepose(VINCI Group)的子公司Spiecapag,这是陆上Trans-Adriatic Pipeline(TAP)项目三个分支的EPC合同。在希腊的基波伊(Kipoi)和卡瓦拉(Kavala)之间,一处是185公里,而在阿尔巴尼亚的比利什特(Bilisht)和托波耶(Topoje)之间,一处则是215公里。此外,Hill International还从Technip S.A.的分支机构Technipetrol Hellas S.A.获得了一份合同,为该项目的建设提供项目管理支持服务。 TAP是南部天然气走廊的欧洲分支,这是一个复杂的能源项目价值链,将阿塞拜疆的天然气供应连接到欧洲。全长870公里的管道将连接土耳其-希腊边界的跨安那托利亚管道,并穿越希腊,阿尔巴尼亚和亚得里亚海,然后在意大利南部上岸。该项目预计将于2020年完成。

著录项

  • 来源
    《Pipeline & gas journal》 |2016年第5期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:16:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号