首页> 外文期刊>Pipeline & Gas Journal >Are You Ready For DIMP?
【24h】

Are You Ready For DIMP?

机译:您准备好使用DIMP了吗?

获取原文
获取原文并翻译 | 示例
       

摘要

The NOPR requires that operators develop and monitor performance measures from an established baseline to evaluate the effectiveness of its Integrity Management program and provides a number of mandatory performance measures. In addition to the list of mandatory measures, the rule also states: "any additional measures to evaluate the effectiveness of the operator's program in controlling each identified threat".
机译:NOPR要求运营商从既定基准制定和监控绩效指标,以评估其完整性管理计划的有效性,并提供许多强制性绩效指标。除了强制措施清单之外,该规则还规定:“任何其他评估操作员程序在控制每种已识别威胁方面的有效性的措施”。

著录项

  • 来源
    《Pipeline & Gas Journal》 |2009年第11期|p.71-72|共2页
  • 作者

    Eric Kirkpatrick;

  • 作者单位

    By Eric Kirkpatrick, Structural Integrity Associates, Inc.Author: Eric Kirkpatrick is a Senior Associate with Structural Integrity Associates and is the principal architect of the leading DIMP plan framework and implementation guide developed for the Northeast Gas Association (NGA) and Southern Gas Association (SGA). He has more than 25 years of experience in gas transmission and distribution engineering, maintenance and operations. He holds a BS degree and Professional Engineering License in Mechanical Engineering as well as a Master of Business Administration degree. He can be reached at ekirkpatrick@structint.com.;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:44:28

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号