机译:Keystone Pipeline的CP旅程跨越了3年和2147英里
Authors Dennis Zadery is a pipeline integrity specialist with Cimarron Engineering, a Calgary based engineering consulting company which specializes in the development, design, installation and integrity maintenance of pipeline systems and station facilities. Contact care/of Ryan Hutchinson, ryan_ hutchinson@cimarron.ab.ca.Brad Woloschuk is a senior corrosion engineer with TransCanada.;
机译:Keystone Pipeline的CP旅程跨越了3年和2147英里
机译:对2,500英里的液化石油产品管道进行远程CP监控
机译:对2,500英里的液化石油产品管道进行远程CP监控
机译:CPS中图像处理管道的设计和管理:FitOptiVis ECSEL项目的2年经验
机译:海上管道的电阳极阴极保护(CP)改造:CP电位分布的分析模型
机译:千英里汽车之旅的下一步
机译:自由跨度潜水管道的振动特性和允许跨度长度