Installation Schedule. Having the CP system available within six months of pipeline start-up raised concerns about dealing with winter CP construction. A large portion of the pipeline is situated in northern climates where winter CP construction results in substantial cost increases and quality control challenges during installation. The CP team decided to start and complete CP installations while final pipeline and station construction was still in progress (Figure 3).
机译:安装时间表。在管道启动六个月内提供CP系统后,人们对处理冬季CP建设感到担忧。管道的很大一部分位于北部气候,冬季CP的施工导致大量成本增加和安装过程中的质量控制挑战。 CP团队决定在最终管道和站点建设仍在进行的同时开始并完成CP安装(图3)。

著录项

  • 来源
    《Pipeline & Gas Journal》 |2011年第6期|p.65-66|共2页
  • 作者单位

    Authors Dennis Zadery is a pipeline integrity specialist with Cimarron Engineering, a Calgary based engineering consulting company which specializes in the development, design, installation and integrity maintenance of pipeline systems and station facilities. Contact care/of Ryan Hutchinson, ryan_ hutchinson@cimarron.ab.ca.Brad Woloschuk is a senior corrosion engineer with TransCanada.;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号