首页> 外文期刊>ew >Besonderheiten grosser Maschinentransformatoren am Beispiel des 3-Schluchten-Wasserkraftwerks in China
【24h】

Besonderheiten grosser Maschinentransformatoren am Beispiel des 3-Schluchten-Wasserkraftwerks in China

机译:以中国三峡谷水电站为例的大型机械变压器的特点

获取原文
获取原文并翻译 | 示例
           

摘要

Large GUS-transformers with a nameplate power beyond 500 MVA need a lot of attention during the design phase because of various limitations like transport dimensions and weight, manufacturing facilities, space on site, allowable temperatures, technical requirements from the specification and so on. Additionally there are the inherent design tasks for large transformers as electrical, thermal and mechanical stresses near to technical limitations. At the example of an 840 MVA transformer for the hydro power station Three Gorges some of the technical problems and their solution will be discussed in more detail.
机译:铭牌功率超过500 MVA的大型GUS变压器在设计阶段需要引起很多注意,例如运输尺寸和重量,制造设施,现场空间,允许温度,技术规格要求等诸多限制。另外,由于电,热和机械应力接近技术极限,大型变压器还有固有的设计任务。以用于三峡水电站的840 MVA变压器为例,将详细讨论一些技术问题及其解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号