首页> 外文期刊>Operations Management Research >Planning with uncertain materials availability: The value of workday flexibility
【24h】

Planning with uncertain materials availability: The value of workday flexibility

机译:不确定的物料供应情况下进行计划:工作日灵活性的价值

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we consider the problem of a manufacturer that faces uncertainty in the availability of its raw materials. This can occur, for example, in a remanufacturing setting where replacements for damaged components are not always available as needed. We examine the potential for flexible workday policies to mitigate the impact of uncertain materials availability, and present a simulation optimization approach to determine staffing levels under various levels of workday flexibility. An example implementation of the aggregate planning model we develop is provided using data from a cell phone reassembly facility in Hong Kong. Our model provides insights for managers regarding the benefits of increasing levels of workday flexibility when raw material availability is uncertain.
机译:在本文中,我们考虑了制造商面临的原材料供应不确定性的问题。例如,这可能发生在再制造环境中,在该环境中,并非总是根据需要提供损坏部件的替代品。我们研究了采用灵活的工作日政策来缓解不确定的物料供应量影响的可能性,并提出了一种模拟优化方法来确定不同工作日灵活性水平下的人员配备水平。我们使用香港手机重组厂提供的数据提供了我们开发的总体规划模型的示例实现。当原材料供应不确定时,我们的模型可为管理人员提供有关提高工作日灵活性水平的好处的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号