...
首页> 外文期刊>Offshore >Polyester ropes can meet design criiteria to extend MODU mooring capability
【24h】

Polyester ropes can meet design criiteria to extend MODU mooring capability

机译:聚酯绳可以满足设计标准以扩展MODU系泊能力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the mid 1990s, Shell (US) was challenged to drill prospects in water depths nearly twice the water depth ratings of the rigs under contract At the same time, the need to eliminate the risk of drive-off or drift-off, and the ability to disconnect in an emergency without significant capex or opex increases to accommodate storms became a challenge. Shell decided that extending the water depth capability of a moored MODU addressed all the issues. An effective upgrade to a rig's maximum water depth rating requires upgrades to both drilling and stationkeeping capabilities. Shell and its contractors developed a Pre-Installed Mooring (PIM) System to supplement the onboard mooring system and address both problems.
机译:在1990年代中期,壳牌(美国)面临的挑战是在合同约定的钻探平台的水深额定值的近两倍的水深中钻探前景。与此同时,需要消除掉落或下沉的风险,以及在紧急情况下断开连接能力而又不大幅增加资本支出或运营支出以适应风暴的能力成为一项挑战。壳牌认为,扩展停泊的MODU的水深能力可以解决所有问题。要有效升级钻机的最大水深等级,就需要同时升级钻井和站台能力。壳牌及其承包商开发了预安装系泊系统(PIM),以补充船上系泊系统并解决这两个问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号