首页> 外文期刊>Offshore Engineer >A streamlined approach to tubular management
【24h】

A streamlined approach to tubular management

机译:流线型管理的简化方法

获取原文
获取原文并翻译 | 示例
           

摘要

Until recently, most aspects of tubular handling and running preparation have been carried out on the rig floor offshore, a process that requires significant manual handling. Typically, tubulars were shipped to the rig and laid out on pipe racks while processes such as cleaning, tallying, thread inspection and drifting were carried out off line by the rig crew, before the pipe could be run in the hole. The number of personnel required to manually carry out these operations on a rig deck of limited space introduced significant risks to safety and efficiency.
机译:直到最近,管材处理和运行准备的大多数方面都是在海上钻机平台上进行的,该过程需要大量的人工处理。通常,将管子运到钻机上并放在管架上,同时在管子可以在孔中穿行之前,由钻机组离线进行清洗,整平,螺纹检查和漂移等过程。在有限空间的钻机甲板上手动执行这些操作所需的人员数量给安全性和效率带来了重大风险。

著录项

  • 来源
    《Offshore Engineer》 |2013年第2期|47-4850-51|共4页
  • 作者

    Aaron Sinnott;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号