首页> 外文期刊>Nucleonics week >Construction on UK's Oldbury site might not start until early 2030s: Horizon
【24h】

Construction on UK's Oldbury site might not start until early 2030s: Horizon

机译:Horizo​​n可能要到2030年代初才能在英国的Oldbury工地上施工

获取原文
获取原文并翻译 | 示例
           

摘要

Construction by Horizon Nuclear Ltd., the 100%-owned subsidiary ofrnJapan’s Hitachi, of a two unit, 2,700-MW nuclear generating station atrnOldbury in western England, may not start until the early 2030s, arnHorizon representative said.rnHorizon plans to build two Hitachi-GE UK ABWRs, each with arncapacity of 1,350-MW, on the site of a former power station that itrnowns in Shepperdine, Oldbury. The site is located adjacent to thernSevern Estuary, a body of water leading into the Irish Sea.
机译:arnHorizo​​n代表说,由日本日立公司100%股权的子公司Horizo​​n Nuclear Ltd.建造的两台2700兆瓦核电站atrnOldbury位于英格兰西部,可能要到2030年代初才能开始.rnHorizo​​n计划建造两座日立公司-GE UK ABWR,每个装机容量为1,350 MW,位于奥尔德伯里Shepperdine的一个前电站所在地。该地点位于瑟恩河口附近,那里是通向爱尔兰海的水域。

著录项

  • 来源
    《Nucleonics week》 |2015年第46期|5-6|共2页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号