NDA 'did well' to end, negotiate new Magnox contract: UK audit office

机译:NDA'做得很好,结束了,谈判新的Magdox合同:英国审计局

获取原文
获取原文并翻译 | 示例
       

摘要

The UK state-owned Nuclear Decommissioning Authority "did well" to terminate an old contract and negotiate a revised two-year deal with the Cavendish Fluor Partnership in Oct. 2017 for the decommissioning of the UK's fleet of Magnox reactors, the UK's National Audit Office said in a Sept. 9 report. "Progress report: terminating the Magnox contract:" examines the NDA's management of the Magnox decommissioning contract with Cavendish Fluor during the two-year notice of contract termination period of the contract, from Sept. 1, 2017 to Aug. 31, 2019. During that period, a revised contract was negotiated that ran through August 2019.
机译:英国国有核退役当局“确实好转”终止旧合同,并于2017年10月在英国国家审计局队的麦克森反应堆退役时谈判修订了两年的两年度交易。 9月9日报告说。 “进展报告:终止麦格森合同:”在合同的合同终止期间两年通知期间,从2019年9月1日起,在合同的两年合约终止期间与Cavendish Fluor审查了NDA的管理。那个时期,经修订的合同在2019年8月谈判。

著录项

  • 来源
    《Nucleonics week》 |2020年第38期|5-5|共1页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号