首页> 外文期刊>Nuclear Weapons & Materials Monitor(BMI) >President Obama Signs Omnibus Spending Package Funding NNSA, DoD Nuclear Weapons Work
【24h】

President Obama Signs Omnibus Spending Package Funding NNSA, DoD Nuclear Weapons Work

机译:奥巴马总统签署综合支出计划,资助国家核安全局,国防部核武器工作

获取原文
获取原文并翻译 | 示例
           

摘要

President Obama this week signed an omnibus spending package that funds the government for the rest of FiscalrnYear 2015. Overall, the bill provides $8.23 billion for the NNSA’s weapons program, an $83 million cut from thernAdministration’s $8.31 billion request but a $450 million increase over the $7.78 billion provided in FY 2014. Thernbill fully funds the Administration’s $643 million request for work on the B61 refurbishment, $259.2 million requestrnfor work on the W76 refurbishment, and its $165.4 million request for work on the W88 Alt 370. The bill alsornprovides $35.7 million for work to sustain Los Alamos National Laboratory’s plutonium capabilities after therncancellation and of the Chemistry and Metallurgy Research Replacement-Nuclear Facility and fully funds thernAdministration’s $335 million request for work on the Uranium Processing Facility, while lifting a restriction on thernuse of construction funds on UPF prior to the 90 percent design threshold. The bill also fully funds a $9.4 millionrnfeasibility study on the cruise missile warhead that the Senate Energy and Water Appropriations Subcommitteernzeroed out.
机译:奥巴马总统本周签署了一项总支出计划,为政府在2015财政年度的其余时间提供资金。总体而言,该法案为NNSA的武器计划提供了82.3亿美元,比thernAdministration的83.1亿美元的申请减少了8,300万美元,但比7.87亿美元增加了4.5亿美元。 2014财年提供的资金总额为30亿美元。Thernbill完全为政府的B61翻新工程要求6.43亿美元,W76翻新工程要求提供2.592亿美元,以及W88 Alt 370的工程要求为1.654亿美元。该法案还为工程提供了3570万美元取消后维持洛斯阿拉莫斯国家实验室的capabilities能力以及化学和冶金研究替代核设施的全额拨款,并为该管理局的3.35亿美元的铀处理设施申请提供全部资金,同时取消对UPF之前的建设资金的限制90%的设计阈值。该法案还为参议院能源和水资源拨款小组委员会宣布的巡航导弹弹头的940万美元可行性研究提供了全部资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号