首页> 外文期刊>Nuclear waste news >Edison Lines Up Consultant to Find a Plan to Get Waste out of San Onofre
【24h】

Edison Lines Up Consultant to Find a Plan to Get Waste out of San Onofre

机译:爱迪生排队顾问找到一个浪费的计划,从圣赛跑

获取原文
获取原文并翻译 | 示例
       

摘要

The long search to find a way to move the 3.55 million pounds of nuclear waste off the premises of the now-shuttered San Onofre Nuclear Generating Station took another step forward when the plant's operator, Southern California Edison, announced it has hired a consulting group to "develop a strategic plan" to relocate the spent fuel to a "commercially reasonable" facility. The utility, known as SCE for short, signed a 20-month contract with North Wind, Inc., a firm based in Idaho with experience in nuclear facility operations and management._One of the members of the consultancy team will be Ernest Moniz, the former secretary of the U.S. Department of Energy during the Obama administration. "The North Wind team is uniquely qualified to lead this effort and provide a roadmap that will benefit the local community, SCE customers, other stakeholders and the nuclear energy industry," SCE senior vice president Kevin Walker said in a statement. Monetary details of the contract between SCE and North Wind were not released. The money will come from the plant's nuclear decommissioning trust fund, which comes from ratepayer dollars accumulated over the years.
机译:很长的搜索找到一种方法,即现在营业的San Onofre核发电站的房屋出现了355万英镑的核废料,当工厂的运营商南加州爱迪生宣布聘请了咨询小组“制定战略计划”将燃料重新定位为“商业合理”设施。该公用事业公司被称为SCE,签署了20个月的与北风,Inc。签订了20个月的合同,这是一家位于爱达荷州的核设施运营经验和管理的公司。咨询团队成员的经验将是Ernest Moniz,这美国能源部前秘书在奥巴马政府。 “北风队是独特的有资格领导这项努力,并提供了一个有利于当地社区,SCE客户,其他利益攸关方和核能行业的路线图,”凯文沃克在一份声明中表示。没有发布SCE和北风之间合同的货币细节。这笔钱将来自该工厂的核退役信托基金,这来自多年来累积的比亚尔。

著录项

  • 来源
    《Nuclear waste news》 |2019年第10期|3-4|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 21:24:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号