The High-temperature Electrolysis Integrated Laboratory-scale Experiment

机译:高温电解综合实验室规模的实验

获取原文
获取原文并翻译 | 示例
       

摘要

The High-Temperature Electrolysis Integrated Laboratory-Scale experiment was designed at the Idaho National Laboratory (INL) and Ceramatec during 2006 and early 2007 and constructed in the spring and summer of 2007. A "half-module," two stacks of 60 cells each, was tested at Ceramatec for 2040 h in June-September 2006 and a full module, four stacks of 60 cells each, was completed in March 2007. Initial shakedown testing of the INL Integrated Laboratory-Scale (ILS) experimental facility commenced on August 22, 2007. Heatup of the first ILS module started at 4:10 PM on September 24, 2007, and ran for 420 h. The test average H_2 production rate was ~1.3 N·m~3/h (Normal cubic meters per hour, where Normal conditions are 273 K and 1 atm) (0.116 kg H_2/h), with a peak measured H_2 production rate of over 2 N·m~3/h (0.179 kg H_2/h). Significant module performance degradation was observed over the first 250 h, after which no further degradation was noted for the remainder of the test. Once all test objectives had been successfully met, the test was terminated in a controlled fashion.
机译:高温电解综合实验室规模的实验是在2006年和2007年初在爱达荷州国家实验室(INL)和Ceramatec设计的,并于2007年春季和夏季建造。“半模块”,两叠,每叠60个电池于2006年6月至9月在Ceramatec进行了2040 h的测试,并于2007年3月完成了一个完整的模块,每个模块有4个堆栈,每组60个电池。INL综合实验室规模(ILS)实验设施的初始改组测试于8月22日开始。 ,2007年。第一个ILS模块的加热于2007年9月24日下午4:10开始,运行了420小时。测试的平均H_2生产率为〜1.3 N·m〜3 / h(正常立方米/小时,正常条件为273 K和1 atm)(0.116 kg H_2 / h),测得的H_2生产率峰值超过2 N·m〜3 / h(0.179 kg H_2 / h)。在最初的250小时内观察到模块性能显着下降,此后在其余测试中未发现进一步的下降。成功满足所有测试目标后,将以受控方式终止测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号