...
首页> 外文期刊>Nuclear Plant Journal >A Passively Safe Reactor
【24h】

A Passively Safe Reactor

机译:被动安全反应堆

获取原文
获取原文并翻译 | 示例
           

摘要

1. What is the timeline for the GE Hitachi Nuclear ESBWR? In the fall of 2014 the GE Hitachi Nuclear Energy Economic Simplified Boiling Water Reactor (ESBWR) was certified by the U.S. Nuclear Regulatory Commission. The ESBWR's technology represents the culmination of more than 55 years of experience designing, building and servicing advanced reactors globally. In addition to its best-in-class safety, the ESBWR includes a modular design for ease of construction, increased fuel efficiency and the lowest projected operating, maintenance and staffing costs per megawatt hour in the industry. GEH offers an experienced team that is supply chain qualified. 2. Which U.S. Utilities are processing COLA with the NRC? Describe the licensing progress. Two license applications referenc-ing ESBWR technology are currently pending with the NRC. In 2008, DTE Energy selected ESBWR technology for a proposed nuclear power plant, Fermi 3, with an NRC license expected in 2015. In 2013 Dominion Virginia Power selected ESBWR technology for its North Anna Unit 3 Nuclear Power Plant project, with an NRC license expected in 2016.
机译:1. GE Hitachi Nuclear ESBWR的时间表是什么? 2014年秋天,GE日立核能经济简化沸水反应堆(ESBWR)获得了美国核监管委员会的认证。 ESBWR的技术代表了全球55多年设计,建造和维修先进反应堆的经验的结晶。除了其一流的安全性外,ESBWR还包括模块化设计,可简化施工,提高燃油效率,并且在业内每兆瓦时的预计运营,维护和人员成本最低。 GEH提供一支经验丰富的团队,具有供应链资格。 2.哪些美国公用事业公司正在与NRC处理COLA?描述许可进度。目前,NRC正在处理两种涉及ESBWR技术的许可证申请。 2008年,DTE Energy为拟议的核电站Fermi 3选择了ESBWR技术,并有望在2015年获得NRC许可。2013年,Dominion Virginia Power为其北安娜3号核电站项目选择了ESBWR技术,并有望获得NRC许可。在2016年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号