...
首页> 外文期刊>Nuclear Plant Journal >Research & Development
【24h】

Research & Development

机译:研究和发展

获取原文
获取原文并翻译 | 示例
           

摘要

Managing and maintaining the diverse pieces of information that relate to the physical configuration of a nuclear power plant is no simple task. Implementing an advanced configuration management information system (CMIS), however, could provide significant operational and economic benefits. A recent EPRI study estimated opportunity savings of $8 billion for the 100 operating U.S. nuclear power plants over the next 20 years by implementing a data-centric CMIS, and more than $1 billion for the four U.S. new nuclear plants under construction over their projected 80-year life. Through savings associated with more efficient data retrieval, reduced data errors, and increased workflow efficiencies, EPRI calculated a probable economic payback of 3.3 years for a new build and 5 years for an operating plant. An integrated CMIS encompasses data and information for all phases of the plant life cycle, including licensing, design, procurement, construction, testing, operations, maintenance, and decommissioning. A CMIS that is not data-centric requires plant staff to find the data in a documents or siloed databases and then verify that it is accurate and updated. Before the data can be used, users frequently must resolve document revisions, resolve naming discrepancies, assure consistency with the design basis, and assure compliance with licensing commitments. EPRI has found that plant staff spend 30-40% of their time searching and validating information in multiple documents, which reduces confidence that technical data needed to make decisions is readily available to evaluate a given design or licensing issue.
机译:管理和维护与核电厂物理配置相关的各种信息绝非易事。但是,实施高级配置管理信息系统(CMIS)可能会带来可观的运营和经济利益。 EPRI最近的一项研究估计,通过实施以数据为中心的CMIS,可在未来20年内为美国100个正在运行的核电厂节省80亿美元的机会,为正在建设的80个核电厂建设的美国四家新核电厂节省超过10亿美元。年生活。通过与更有效的数据检索,减少的数据错误以及更高的工作流程效率相关联的节省,EPRI计算出了新建工厂可能需要3.3年的经济回报,而运营工厂则可能需要5年。集成的CMIS包含了工厂生命周期所有阶段的数据和信息,包括许可,设计,采购,建造,测试,运营,维护和退役。并非以数据为中心的CMIS要求工厂员工在文档或孤立的数据库中查找数据,然后验证其准确性和更新性。在使用数据之前,用户经常必须解决文档修订,解决命名差异,确保与设计基础保持一致并确保遵守许可承诺。 EPRI发现,工厂员工将30%至40%的时间用于搜索和验证多个文档中的信息,这降低了人们信心,即决策所需的技术数据可随时用于评估给定的设计或许可问题。

著录项

  • 来源
    《Nuclear Plant Journal》 |2015年第1期|21-22|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号