...
首页> 外文期刊>Nuclear news >Renaissance Watch
【24h】

Renaissance Watch

机译:文艺复兴时期的手表

获取原文
获取原文并翻译 | 示例

摘要

On June 30, Florida Power & Light Company applied for combined construction and operating licenses (COL) for two Wes-tinghouse AP1000 pressurized water reactors for the Turkey Point site in Florida, and at this writing, the Nuclear Regulatory Commission was conducting its acceptance review of the application. Babcock & Wilcox announced plans on June 9 to develop a 125-MWe modular PWR called mPower, with a certification application planned for 2011 and the Tennessee Valley Authority cooperating to assess the Clinch River site in Tennessee for suitability (AW, July 2009, p. 17). After announcing in April that it was suspending its own work on Callaway-2 but requesting that the NRC continue reviews of the COL application, AmerenUE in June asked the NRC to suspend the agency's work as well.
机译:6月30日,佛罗里达电力与照明公司(FOL)为佛罗里达州火鸡角(Turkey Point)站点的两个Wes-tinghouse AP1000压水堆申请了联合建造和运营许可证(COL),在撰写本文时,核监管委员会正在进行接受审核。的应用程序。 Babcock&Wilcox于6月9日宣布计划开发称为mPower的125兆瓦模块式压水堆,计划于2011年申请认证,田纳西河谷管理局(Tennessee Valley Authority)合作评估田纳西州克林奇河(Clinch River)场址的适宜性(AW,2009年7月,第17)。在4月份宣布暂停其在Callaway-2上的工作,但要求NRC继续审查COL申请后,AmerenUE在6月要求NRC也暂停该机构的工作。

著录项

  • 来源
    《Nuclear news 》 |2009年第9期| 26-27| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号