...
首页> 外文期刊>Nuclear news >THE WATTS BAR-2 HEARING PROCESS MAY SOON TAKE SHAPE
【24h】

THE WATTS BAR-2 HEARING PROCESS MAY SOON TAKE SHAPE

机译:WATTS BAR-2听证会可能很快成形

获取原文
获取原文并翻译 | 示例

摘要

The watts bar-2 hearing process may soon take shape.The Tennessee Valley Authority submitted its updated operating license application to the Nuclear Regulatory Commission in March, and on April 9, the NRC informed Tennessee Gov. Phil Bredesen of its submission, saying that a notice would soon be published in the Federal Register to open the application to public requests for a hearing. TVA decided in 2007 to complete the construction of the long-delayed 1177-MWe pressurized water reactor near Spring City, Tenn. At the end of 2008, TVA estimated that the reactor was 70 percent complete and that power operation will begin by 2013.
机译:瓦特2瓦特听证程序可能很快就会成形。田纳西河谷管理局于3月份向核监管委员会提交了最新的运营许可证申请,而4月9日,NRC通知田纳西州州长Phil Bredesen表示,通知将很快在《联邦公报》上发布,以向公众公开听证申请。 TVA于2007年决定完成在田纳西州斯普林市附近建造的长时1177-MWe压水反应堆的建造,到2008年底,TVA估计该反应堆已完成70%,并将于2013年开始发电。

著录项

  • 来源
    《Nuclear news 》 |2009年第6期| 56-56| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号