首页> 外文期刊>Nuclear news >Epc Contract Signed For Two Ap1000s
【24h】

Epc Contract Signed For Two Ap1000s

机译:签订两台Ap1000的Epc合同

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Progress Energy is the third organization to sign an engineering, procurement, and construction contract for new power reactors, but like all other new license applicants, the company asserts that it is not yet committed to building them.The order books of Westinghouse Electric Company and the Shaw Group grew thicker on January 5, when Progress Energy announced that it has signed an engineering, procurement, and construction (EPC) contract with Westing-house and Shaw for two AP1000 advanced pressurized water reactors intended for a site in Levy County, Fla. It is the third EPC contract signed for new power reactor projects in the United States-the others are for Southern Nuclear Operating Company's Vogtle-3 and -4 in Georgia and SCANA's Summer-2 and -3 in South Carolina-and all three are for twin Westinghouse AP1000s. A Progress spokesperson called the signing a "critical step" in maintaining the option to build new reactors but told Nuclear News that the company does not yet consider itself to be committed to building them.
机译:Progress Energy是第三个签署新动力反应堆工程,采购和建造合同的组织,但与所有其他新的执照申请人一样,该公司声称尚未承诺建造这些反应堆。西屋电气公司和1月5日,邵氏集团(Shaw Group)的业务日渐扩大,当时Progress Energy宣布已与西屋公司(Westing-house)和邵氏(Shaw)签订了工程,采购和建设(EPC)合同,以购买两座AP1000先进压水堆,这些反应堆将设在佛罗里达州利维县这是在美国签署的新电力反应堆项目的第三个EPC合同-其他合同是在Southern Georgia Operating Company的佐治亚州的Vogtle-3和-4以及在南卡罗来纳州的SCANA的Summer-2和-3-这三个合同都是适用于双西屋AP1000。 Progress发言人称,签署该协议是维持建造新反应堆的选择权的“关键步骤”,但他告诉《核新闻》,该公司尚未考虑建造新反应堆。

著录项

  • 来源
    《Nuclear news》 |2009年第2期|p.14-1520-2426-27|共9页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号